Façade / System
175 Curtain Wall
Curtain wall system for coordinated glazed building envelopes.

Technical coordination
What to confirm before specification
Opening and layoutCoordinate the mullion and transom grid with the façade elevations.
Building interfaceReview slab-edge interfaces, perimeter seals and movement joints.
Hardware and operationCoordinate anchors, glazing installation sequence and access for maintenance.
Performance documentationIdentify the applicable market, project criteria and exact configuration so the relevant documentation can be reviewed.
Confirm the selected assembly and glazing with the project team before specifying the system.
Documentation
Request documents for this system
Include the model, drawing revision and required document type when requesting technical information.
Project enquiry
Have a project in mind?
Prepare the project location, opening schedule and any relevant model references before starting an enquiry.